|
During April 2007, Perth saw one of the largest conferences to ever hit Western Australia. The IBM Asia 2007 conference hosted more than 4000 delegates with major events held at the PCEC Ballroom and the Grand Ballroom at the Burswood Entertainment Complex, with smaller installations and events occurring in other venues across Perth.
General Manager Jerry Reinhardt was given the mammoth task of coordinating the lighting, audio visual and scenic construction for the Japanese, Chinese, Korean and ASEAN events held at Burswood and PCEC. Backed by the awesome team at CCP, Jerry Reinhardt with Tim Bradsmith, Martin McKinney, Jayke Pritchard, Dean Gratwick, Stuart Turner and Shannon Ward installed and operated the lighting throughout the Burswood and PCEC, with Produce Now from Melbourne supplying and operating the AV segments of the events. Artsworkshop and Statewide Staging, both from Perth developed the massive set and scenery which took months of construction.
The event attracted a huge amount of interest with a great amount of positive feedback received of the presentation of the two major events at Burswood and PCEC.
Equipment used include:
High End Catalyst
DL-1 moving head projector
12 x Martin MAC2000 Profiles
12 x MAC700 Profiles
12 x MAC500
28 x MAC600
150 x Kupo Chrome Par 64’s
28 x ETC 750w Parnels
12 x ETC Source Four 15/30 degree Zooms
14 x ETC S4 26 degree Profiles
12 x Prolite 1000w 4 Cell Cyc Lights,
4 x 4Lite Blinders
55 x LED VersaTubes
6 x 3000w Martin Atomic Strobes
2 x 1400w Selecon Rua Followspots
2 x 1200w Selecon Performer Followspots
2 x 2500w Studio Due CityColors
Jands dimmers
Whole Hog II
Jands Event 60/120
Global 400mm truss
CCP would like to thank all the local production companies who assisted up during this very exciting but hectic time.
|